DESCRIPTION

Sevendale House was transformed in 2014, crafting 70,000 sq ft of Grade A workspace behind a Grade II listed façade. Accessed via Dale Street, the journey unfolds through an impressive entrance, leading to a spacious ground floor reception area illuminated by a soaring atrium.

At a cost of £2.5 million, the next phase completed in October 2024. The ground floor reception has undergone a comprehensive redesign, incorporating breakout spaces, private meeting rooms, event areas, and wellness facilities to activate the building’s environment fully.

A new internal staircase connects the ground floor to the lower ground level, transforming it into co-working spaces, informal meeting areas, a fitness studio, and top-notch end-of-journey facilities. A dedicated cycling and shower hub will offer secure storage, high-end showers, lockers, and a customized vanity section.

Sevendale House already boasts contemporary features:

  • Speed gate-equipped reception
  • Full-height atrium for natural light
  • Three passenger lifts (2x glass lifts)
  • Dedicated goods lift
  • Loading bay for deliveries
  • Cycle storage and premium changing facilities
  • WC facilities on each floor
  • Fully accessible raised floors (floors 1-3)
  • LG7 lighting with control
  • Air conditioning
  • Divisible floors for flexibility.